10MW PV Project - Licensing Stage

150.000€
Owner Profile
Limited Liability Company (LLC)
Thessaloniki
ID: APE-55443
Project Current Status Under Construction
Power
867 kW
Estimated Annual Production
824 KWh
FIT (Agreed Selling Price)
344 €/KWh
Station Connection Type Station Connection Type
Medium Voltage (MV)
Environmental Terms Approval (AEPO) Environmental Terms Approval (AEPO)
Yes
Field Orientation Field Orientation
id nulla suscipit
Farmland Area Farmland Area
791 stremma
Energy Support Contract Energy Support Contract
Yes
Distance from Grid Distance from Grid
416 m
Ownership Status Ownership Status
Owned
Annual Rent Annual Rent
932 €
Road Access Road Access
Yes

License Technical Characteristics

Power **REDACTED**
Estimated Annual Production **REDACTED**
FIT (Agreed Selling Price) **REDACTED**
Distance from Grid **REDACTED**
Station Connection Type **REDACTED**
Connection Contract **REDACTED**
Connection Terms Request **REDACTED**
Final Connection Offer **REDACTED**
Final Connection Offer Expiry **REDACTED**
Connection Terms Amount **REDACTED**
Connection Terms Acceptance **REDACTED**
Energy Support Contract **REDACTED**
Guarantee Letter Payment **REDACTED**
Guarantee Letter Amount **REDACTED**
Unlock all the information

Land Details

Farmland Area **REDACTED**
Ownership Status **REDACTED**
Annual Rent **REDACTED**
Lease Duration **REDACTED**
Field Orientation **REDACTED**
Terrain Morphology **REDACTED**
Altitude **REDACTED**
Distance from Sea **REDACTED**
Neighboring Land Uses **REDACTED**
Road Access **REDACTED**
Unlock all the information

Permits & Studies

Environmental Pre-Study (PPE) **REDACTED**
Environmental Impact Assessment (EIA) **REDACTED**
Standard Environmental Commitments (PPD) **REDACTED**
Environmental Terms Approval (AEPO) **REDACTED**
Polygon Registration **REDACTED**
Topographic Diagrams **REDACTED**
Station Layout Study **REDACTED**
Single-Line Diagrams **REDACTED**
PV Simulation Study **REDACTED**
Producer Certificate **REDACTED**
HEDNO File Completeness **REDACTED**
Installation Permit **REDACTED**
Estimated Capex / OPEX **REDACTED**
Unlock all the information

Area Analysis

Approximate
The area shown above is approximate.

Submit Offer

The myAPE team can support you in completing the deal.

Click below and a specialized legal advisor will contact you within 24-48 hours to guide you through all the necessary steps. The consultation is with no obligation.
or

Contact Details

**REDACTED**
Phone: **REDACTED**
Email: **REDACTED**
Unlock all the information

This 10MW project is situated in one of Greece's highest irradiation zones, with annual GHI exceeding 1,700 kWh/m2. Environmental permits have been obtained following a comprehensive assessment. The grid connection application is in the final review stage with HEDNO. The flat terrain and proximity to the medium voltage network make this site particularly attractive for development. A detailed feasibility study and bankable energy yield assessment are available for serious investors.