QA Fixture - Multi Image Listing

2.500.000€
Owner Profile
Single-Member Capital Company
Euboea
ID: APE-ADMIN-001
Project Current Status Under Construction
Power
848 kW
Annual Energy Production
871 KWh
FIT (Agreed Selling Price)
977 €/KWh
Annual Turnover Annual Turnover
415 €
Support Bases Support Bases
Four Seasons
Farmland Area Farmland Area
34 stremma
Ownership Status Ownership Status
Owned
Annual Rent Annual Rent
498 €
Loan Loan
No
Investment Return Investment Return
108 %
Curtailment Curtailment
610 %

Technical Park Characteristics

Outdoor Substation Kiosk **REDACTED**
MT Panels **REDACTED**
Transformer **REDACTED**
Transformer Type **REDACTED**
Panel **REDACTED**
Panel (Manufacturer) **REDACTED**
Inverters **REDACTED**
Number of Inverters **REDACTED**
Set Point **REDACTED**
Telemetry **REDACTED**
Fencing **REDACTED**
Monitoring Systems **REDACTED**
Alarm Systems **REDACTED**
Altitude **REDACTED**
Distance from Sea **REDACTED**
Unlock all the information

Operating Expenses

Electrical Maintenance Contract **REDACTED**
Electrical Maint. Duration **REDACTED**
Electrical Maint. Cost **REDACTED**
Substation Maintenance Contract **REDACTED**
Substation Maint. Duration **REDACTED**
Substation Maint. Cost **REDACTED**
Farm Cleaning Cost **REDACTED**
Panel Cleaning Cost **REDACTED**
Farmland Lease Duration **REDACTED**
Active Insurance Contract **REDACTED**
Insurance Contract Cost **REDACTED**
Internet Provider Contract **REDACTED**
Select Provider **REDACTED**
Annual FOSE Cost **REDACTED**
Annual DEH Cost **REDACTED**
Unlock all the information

Project Financial Data

Loan Amount **REDACTED**
Loan Balance **REDACTED**
Loan Duration **REDACTED**
Lump Sum Repayment Possible **REDACTED**
Bank Institution **REDACTED**
Interest Rate **REDACTED**
Unlock all the information

Area Analysis

Approximate
The area shown above is approximate.

Submit Offer

The myAPE team can support you in completing the deal.

Click below and a specialized legal advisor will contact you within 24-48 hours to guide you through all the necessary steps. The consultation is with no obligation.
or

Contact Details

**REDACTED**
Phone: **REDACTED**
Email: **REDACTED**
Unlock all the information

Located on the sun-drenched island of Zakynthos, this 2.5MW PV park has consistently exceeded projected energy yields since its commissioning in 2019. The installation utilizes premium monocrystalline panels with single-axis tracking, maximizing energy capture throughout the day. A full 20-year feed-in tariff contract ensures guaranteed revenue streams. The park includes a comprehensive SCADA monitoring system, perimeter security, and an active insurance policy. Complete financial records and technical due diligence documentation are available upon request.